Selective interior demolition in Toronto and the GTA.
Selective interior demolition and strip-outs, with the scope and disposal discussed before work starts.

Common demolition jobs.
- Removing old flooring, tile or non-structural finishes
- Stripping a room before a renovation
- Taking out built-ins or old fixtures (no plumbing or electrical disconnection)
- Clearing debris ready for the next trade
All demolition is subject to inspection and scope. Structural work and hazardous materials, including suspected asbestos, require appropriate specialists. Electrical, gas and plumbing work is not offered.
Representative imagery. Not a completed crew project.
What we look at
- What is structural and what is not
- Signs of hazardous materials needing a specialist
- Protection for floors and adjoining rooms
What affects the estimate
- Area and type of material
- Access, stairs and parking
- Volume and type of debris for disposal
- Utilities that must be disconnected by licensed trades first
Before you send
- Photos of each area to be removed
- The approximate age of the property
- Who will handle any utility disconnection
Scope, materials and any disposal costs are agreed in writing before a date is booked.
Do you remove load-bearing walls?
No. Structural work needs an engineer and appropriate specialists. This service covers selective, non-structural interior removal.
What about asbestos or other hazards?
Suspected hazardous materials must be tested and handled by specialists before any demolition can proceed.
Often paired with
A few details.
A good place to start.
From one small repair to a list of property jobs, tell us what you have in mind.
Your photos help us understand the scope.
Your exact location and scope help us confirm availability.
Your details stay private.